building stairs calculator residential construction estimating software material and labor cost calculator
Visit https://www.bhadanisrecordedlectures.com/
BHADANIS LEVEL 1 TO LEVEL 5 COURSE FOR CIVIL ENGINEERS & CONSTRUCTION PROFESSIONALS
Quantity Surveying & Estimation and Costing ,QA and QC
Level 1 - Duration :- 30 Days
Understanding the Role of BHADANI'S Construction Management Training and Role of Construction Managers in the Construction Industry
Artificial Intelligence Introduction (**New**)
Quality Control and Quality Assurance Techniques used (Basics)
Construction Methodologies of Civil Works and How it works in Construction Industry
Construction Activities Identification Analysis and Report Generation
Making Project Chartered and Feasible Reports
Project Risk Analysis and Action Reports
Understanding and Reading the Structural and Architectural Drawings
Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc.
Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.)
Faster Take off Methodologies from Drawings of Civil
Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards
Estimation of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
Estimation Technique During Design Phase
Estimation Technique During Pre-Construction Phase
Estimation Technique During Post-Construction Phase
Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
Pre-Engineered Building (PEB) Estimation
Costing Techniques of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
Costing Techniques- Risk Based Costing
Costing Techniques - Parametric Costing
Costing Techniques - Machinery Transport Management and Costing
Costing Techniques - Scope Estimation and Cost Analysis
Costing Techniques - Artificial Intelligence (**New**)
Costing Techniques - Consulting Part and Software Usage Part for the Construction Project
S-Curve Reporting
Labour Deployment Planning As per Budget
Labour Economics and Productivity Analysis
Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique
Economic Order Quantity (EOQ) and Management
Machinery Output Analysis as per Market Standards
Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.
Bill of Quantity (BOQ) Take off (Material and Preparation)
Rate Analysis of All Kinds of Civil Works
Material Reconciliation Techniques from Contractor and Client's Side
Material Procurement Strategies as per the techniques used in Quantity Surveying
FREE LANCE Quantity Surveying with Hands on Practice
After Completing Level 1 ~ You can Apply for the Position of Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Billing Engineering
BHADANIS QUANTITY SURVEYING INSTITUTE - ESTIMATION AND COSTING COURSES FOR CIVIL ENGINEERS
Level 2 Duration :- 15 Days
Understanding the Role of BHADANI'S Billing Engineer / Invoice Engineering in the Construction Management and Industry of India and World
Billing Engineering Tasks at Site Office and Understanding the Role in Head office with the Client Coordiation
Account Basics requirement for Billing Engineer
Construction Billing Procedures From Client Side as well as Contractor Side
Interim Payment Certification (IPC) from Client Sides as well as Contractor Side
RA Bill Making - Client Billing - Subcontracting
Billing with GST and Without GST - hands of Expertise
CPWD and Corporations and PSU's Techniques of Billing
Invoice Generation Through ERP
Claim and Dispute Settlement Procedures and all required techniques in Billing and MIS Generation for the same
Material Engineering Bills for Both Client Side as well as Contractor's Side
Third Party Contractor Billing
Joint Venture Companies / Contractor Billing
Petty/ Vendor Billing
Preliminary Billing - Post Construction Billing
InterAlia Billing , International Billing Challan Generation
Claim Management Procedures used by Invoice Engineers
Claim of Price Variations as per Norms of Govt. of INDIA
Claim of Quantity Variations as per the Norms of Govt. of INDIA
Mode of Measurement as per IS Codes with Nomenclatures
Claim of Extra Item Analysis of All Kinds of Civil Works During the Site Execution as well as Post Contracting Period
Vendor Vs. Client Bill Reconciliation
After Completing Level 1 and 2 ~ You can Apply for the Position of Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Tendering and Construction Contracts Management (Contract Engineering)
LEVEL 3 & 4:- DURATION :- 30 DAYS
Tendering Documents Preparation
Tendering Documents Submission Guidelines
Tender Review Reports Generation (T.R.R) for the Contractors as well as Consultants
Technical Bidding As per Government Laws and as per BHADANI'S Technique
Financial Bidding As per Government Laws and as per BHADANI'S Technique
Statutory Documents Preparation Techniques for the Tender
Purchasing and Negotiation Techniques used by Clients and as well as Contractor's Side
Pre-Bid Meeting Strategy Building and Coordination with Client
Finding Deviations and Clarify with the Client
Tender Hunting
Reverse Auctioning Strategy Building and Pressurizing client for the tender
Pooling Technique to use effectively for the Tender to get Maximize Benefits
Evaluation Strategy - Bidding Strategy - Relationship Building
Indemnify the Tender with the Use of Effective Monitoring of the Tender
Entering Into Contracts - Strategy Building Approach - Scientific Approach
Construction Contracts Documents Formulation and Preparation
Procedures in Contract Management - Pre - Construction and Post Construction Phase
Clearing , Forwarding and Transport
Transport Management
Interpretation of Contracts and Contract Terms
Cost Overrun and Time Overrun - Strategy Building Approach
Indian Laws for Construction Contract Management
FIDIC International Laws (EPC Turnkey Projects)
Work Order Preparation ( Like Alstom Siemens Etc.)
Live Project Training for Procurement and Negotiation Techniques
After Completing Level 1 to 4 ~ You can Apply for the Position of Tendering Engineer, Contracts Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
BHADANIS QUANTITY SURVEYING INSTITUTE - ESTIMATION AND COSTING COURSES FOR CIVIL ENGINEERS
PROJECTS MANAGEMENT AND PLANNING ENGINEERING
Critical Thinking and Problem Solving Approach
Strategical Thinking and Risk Analysis
Project Planning - Master Plan Generation
Project Management Procedures Used for Construction Industry by Big MNC's and Construction Companies of India and World
Role of Project Manager in Construction Industry
Project Budget Preparation with all factors analysis in Hand
Actual Situation Comparison with Budget Amount
Progress Monitoring with the Key Indicators Strategy
MS Project - Scheduling and Primavera P6 Software
Project Coordination Techniques with Accounts , HR , Purchase and Procurement Departments with easy solutions
Management Information Generation
Modern Building Construction Trends Execution Plan & Strategy Building
Resettlement and Rehabilitation (R&R) for speedy progress of work
Quality Assurance with Total Quality Control Planning
Site (Field) Management Techniques used by Project Managers at Site
Management of Emergencies in High Rise Buildings
Self Inspection for Quality Construction at Site
Cost and Time Controlling Strategies used for Construction Projects
Cash Flow Monitoring - Budget Vs Actual Comparison
Green Sheet Report - Profit and Loss Determination for Construction Projects
SWOT Analysis for Construction Project
JIT Implementation in any Construction Project
Earned Value Management (EVM) in Construction Project
After Completing Level 1 to Level 5 ~ You can Apply for the Position of Planning Engineer, Project Manager, General Manager, Incharge, Tendering Engineer, Business Development Manager/ Executive, Contract Executive, Construction Contract Manager, Billing Engineer / Invoice Engineer , Technical Invoice Expert Junior Quantity Surveyor , Estimator, Cost Engineer, BBS Engineer , Document Controller Etc. for the Projects of Building, Roads, Highways and Bridges
Top of Form
Civil Engineer , Fill the below form to get Course Brochure in your Mail ~ Don't Waste time , This is Career Booster Training and Fully Market Designed Training? Just Fill this Form to get all your Doubts Clear or Call or Whatsapp us at +919990990844