What is the course fee of a quantity survey course in India?

www.billingengineer.in www.billingengineer.com



BHADANI’S Quantity Surveying in Estimation Civil - Construction Level 1 - Duration :- 45 Days

Understanding the Role of BHADANI'S Quantity Surveying in the Construction Industry

Checklist of All Kinds of Civil Works at Site.

Construction Methodologies of Civil Works and How it works in Construction IndustryConstruction Activities Identification Analysis and Report Generation Making Project Chartered and Feasible Reports Project Risk Analysis and Action ReportsUnderstanding and Reading the Structural and Architectural Drawings Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc. Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.) Faster Take off Methodologies from Drawings of Civil Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards Estimation of All Kinds of Civil Works  Estimation Technique  During Design Phase  Estimation Technique During Pre-Construction Phase Estimation Technique During Post-Construction Phase Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc. Pre-Engineered Building (PEB) Estimation  Costing Techniques of All Kinds of Civil Works (Concrete , Brikcwork, Earthwork, Finishing Work, Wood Work, Steel Work, Demolishing Works Etc.)Costing Techniques- Risk Based Costing Costing Techniques - Parametric Costing Costing Techniques - Machinery Transport Management and Costing ​Costing Techniques - Scope Estimation and Cost Analysis ​S-Curve Reporting  Labour Deployment Planning As per Budget  Labour Economics and Productivity AnalysisLabour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique Economic Order Quantity (EOQ) and Management​Machinery Output Analysis as per Market Standards Profit and Loss Analysis in Labour and Machinery Deployed at Construction SiteDaily Work Report (DWR) Preparation as per Quantity Surveyor Standards Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.​Bill of Quantity (BOQ) Take off (Material and Preparation) Rate Analysis of All Kinds of Civil Works Material Reconciliation Techniques from Contractor and Client's Side Material Procurement Strategies as per the techniques used in Quantity Surveying FREE  LANCE Quantity Surveying with Hands on Practice

6 views
For New Batch Intimation or Information Every Time ~ Put your Email ID and Subscribe our Blog

Subscribe !! and Don't Put your Career in a Hell because BHADANIS is very Important for Every Civil Engineer of the world

© 2023 by BHADANIS . Proudly created by Steve Jonhnson  

  • Bhadani Quantity Surveyors and Tra
  • Grey Twitter Icon